PONT ARCHITECTURAL AND DESIGN STUDIO
  • HOME
  • ARCHITECTURE
  • PRODUCT DESIGN
  • PRESS
  • THE STUDIO
  • Contact

ARCHITECTURE/ AMP BUILDING

    LOCATION

PROJECT TYPE

PROJECT STATUS

LOT AREA

    Nivel Hills, Cebu City
Commercial
Completed
600 sqm.
Picture

Building that can multi-task.

A 3-storey building located near the center of the city of Cebu.
The sloping 600 sqm. lot is fronting a 12-meter-wide road situated in between the Commercial and Residential district. Its location became a prime business area when Cebu’s government announced its future urban planning to connect one of Cebu’s highland provinces to the city through a series of road infrastructures. The existing road on where this site lies along is the only channel towards the said future development.  Within the span of one and a half year, this structure was realized. 
As a response to the limited site area and the aim for high gross rentable floor area, the parking lot was sacrificed. To compensate and to satisfy the building’s functionality, tenant’s comfort and local authorities, the operational strategy was changed and was specifically customized to cater for two different markets, tenants and operating hours. During daytime, commercial office spaces at level 2 operates. At night, the restaurant and bar at Level 1 and 3 operates. By doing so, the required operational parking spaces were reduced as the building users were shifting in different timing. The AMP building’s design did not only focus on the physical architecture but also on its critical operational design. 
Picture
Picture
Picture
Picture

ARCHITECTURE/ AMP BUILDING

    LOCATION:                  Nivel Hills, Cebu City
​    PROJECT TYPE:          Commercial
​    PROJECT STATUS:     Completed        
​    LOT AREA:                   600 sqm.
Picture

Building that can multi-task.

A 3-storey building located near the center of the city of Cebu.
The sloping 600 sqm. lot is fronting a 12-meter-wide road situated in between the Commercial and Residential district. Its location became a prime business area when Cebu’s government announced its future urban planning to connect one of Cebu’s highland provinces to the city through a series of road infrastructures. The existing road on where this site lies along is the only channel towards the said future development.  Within the span of one and a half year, this structure was realized. 
As a response to the limited site area and the aim for high gross rentable floor area, the parking lot was sacrificed. To compensate and to satisfy the building’s functionality, tenant’s comfort and local authorities, the operational strategy was changed and was specifically customized to cater for two different markets, tenants and operating hours. During daytime, commercial office spaces at level 2 operates. At night, the restaurant and bar at Level 1 and 3 operates. By doing so, the required operational parking spaces were reduced as the building users were shifting in different timing. The AMP building’s design did not only focus on the physical architecture but also on its critical operational design. 
Picture
Picture
Picture
Picture
Pont Studio ©
back
next
Powered by Create your own unique website with customizable templates.
  • HOME
  • ARCHITECTURE
  • PRODUCT DESIGN
  • PRESS
  • THE STUDIO
  • Contact